North Creek Road and Bridge
Submissions closed Wednesday 24 September 2025.
Ballina Shire Council sought feedback on the Concept Design, Cost Estimate and preliminary impact assessment reports for the North Creek Road and Bridge project from August to September 2025.
This project will involve:
- Reconstruction, widening and raising of North Creek Road between Forest Oak Boulevard in North Ballina and Skennars Head Road in Skennars Head
- Provision of an adjacent new shared pedestrian/cycle path
- Construction of a new bridge across North Creek.
The new bridge will re-establish the previous western road link between Ballina and Lennox Head that was severed in the 1970s followingContinue reading
Submissions closed Wednesday 24 September 2025.
Ballina Shire Council sought feedback on the Concept Design, Cost Estimate and preliminary impact assessment reports for the North Creek Road and Bridge project from August to September 2025.
This project will involve:
- Reconstruction, widening and raising of North Creek Road between Forest Oak Boulevard in North Ballina and Skennars Head Road in Skennars Head
- Provision of an adjacent new shared pedestrian/cycle path
- Construction of a new bridge across North Creek.
The new bridge will re-establish the previous western road link between Ballina and Lennox Head that was severed in the 1970s following construction of the alternative Coast Road.
Council’s Roads Contributions Plan and Strategic Road Network modelling identifies this project as a required link to accommodate future traffic volumes generated by urban growth areas, and to minimise existing congestion on roads between Lennox Head and Ballina.
Next Steps
Community feedback was collated and reported to the December council meeting where Council considered the concept design, cost estimate, environmental impacts, landowner and community feedback. A report on the project and submissions is in Item 10.1 of the 11 December 2025 Council meeting agenda. Copies of submissions are available to view on the Agendas and Minutes page of Council's website.
After considering the report and submissions Council formally resolved:
1. That Council endorses the exhibited concept design for the North Creek Road and Bridge project, subject to adopting the changes to the concept design, and future stages of the project as set out in the “Proposed Action” column of Tables 1-9 of this report.
2. That Council defers a decision to retain or discard the North Creek Road and Bridge Project, with an estimated cost of $72.5m, until a further report is presented to Council in 2026 on recommended amendments to the Ballina Shire Roads Contribution Plan. This report will be informed by Traffic modelling of the Ballina Shire Road Network currently being conducted by Bitzios Consulting for the period to 2046.
The project to model the traffic volumes on the Ballina Shire Road Network in the year 2046 is expected to be completed around March 2026. A report will then be prepared for Council on options to optimise the future road network.
These options will consider, on a whole of network basis, the merits of including the North Creek Road and Bridge Project and many other road projects in the future road network.
Submissions closed
-
24 September 2025
Concept Design Documents
-
Concept Design Plans.pdf (37.7 MB) (pdf)
-
Cost Estimate.pdf (285 KB) (pdf)
-
Concept Design Report.pdf (1.24 MB) (pdf)
-
Associated Documents
-
Planning Report.pdf (3.09 MB) (pdf)
-
Biodiversity Impacts Report.pdf (19.4 MB) (pdf)
-
Biodiversity Values Report.pdf (20.6 MB) (pdf)
-
Aboriginal Cultural Heritage Assessment.pdf (17.3 MB) (pdf)
-
Statement of Heritage Report - European.pdf (15.3 MB) (pdf)
-
Hydrology and Water Quality Assessment.pdf (4.17 MB) (pdf)
-
Flood Impact Assessment.pdf (93.5 MB) (pdf)
-
Noise and Vibration Impact Assessment.pdf (5.61 MB) (pdf)
-
Preliminary Visual Assessment.pdf (4.65 MB) (pdf)
-
Concept Bridge Plans.pdf (909 KB) (pdf)
-
Geotechnical Report.pdf (17.5 MB) (pdf)
-
Road Safety Audit.pdf (15.1 MB) (pdf)
-
Project Timeline
-
Project added to Roads Contribution Plan - February 2010
North Creek Road and Bridge has finished this stageFollowing public exhibition and consideration by Council, the project was included as an item in the Works Schedule of the Ballina Shire Roads Contribution Plan 2010.
-
Flood study - August 2021 - November 2021
North Creek Road and Bridge has finished this stageFlood study commissioned to determine road formation height, North Creek bridge length, size and number of culverts in approaches to the bridge. These culverts are to be sized to minimise flood impacts on upstream land.
-
Survey of existing road - November 2021 - March 2022
North Creek Road and Bridge has finished this stageDetailed survey of the existing road and 20m either side of the road centreline
-
Preparation of design/reports - December 2022 - May 2025
North Creek Road and Bridge has finished this stageFollowing a public tender process, Consultants Geolink were contracted to prepare concept road and bridge design, associated cost estimates and preliminary environmental/heritage assessment.
-
Advice to landowners - June 2025
North Creek Road and Bridge has finished this stageAdvice to adjacent landowners on the impact of concept design on their land, followed by preliminary consultation and negotiations with affected landowners.
-
Public Exhibition of Concept Design - August - September 2025
North Creek Road and Bridge has finished this stagePublic exhibition of the Concept Design, Cost Estimate and preliminary planning, environmental, geotechnical, heritage, hydrology, flooding, noise/vibration and visual assessment reports.
-
Report to Council - December 2025
North Creek Road and Bridge is currently at this stageCouncil to consider concept design and cost estimate; environmental impacts; outcomes of landowner and community consultation; and decide whether to proceed with and fund the next phase of the project.
If Council decides to proceed to next stage of project the timeline will include a formal environmental assessment and planning application/approval process followed by detailed design and preparation of tender documents for construction.
For more information visit Council's website.