Share Adoption of Amendments to Ballina Shire Development Control Plan 2012 - Chapter 3 Urban Subdivision on FacebookShare Adoption of Amendments to Ballina Shire Development Control Plan 2012 - Chapter 3 Urban Subdivision on TwitterShare Adoption of Amendments to Ballina Shire Development Control Plan 2012 - Chapter 3 Urban Subdivision on LinkedinEmail Adoption of Amendments to Ballina Shire Development Control Plan 2012 - Chapter 3 Urban Subdivision link
Consultation has concluded
At Council's Ordinary meeting on 22 August 2024 Council adopted the amendments with the following changes to the publicly exhibited draft DCP amendments. The amendments to the DCP will take effect from 11 September 2024:
Amended the Structure Plan and other relevant Cumbalum B Precinct plans to:
Delete the earthworks investigation areas.
Remove all stormwater and retention areas.
Delete proposed Signalised Intersection from the legend.
Remove the mapped mosquito buffer treatment areas.
Amended Element B relating to hydrology and stormwater to:
clarify the purpose of environmental monitoring measures, which is to inform subdivision design to ensure that post developmentmimics pre-development characteristics and establish the measures that will be required to ensure groundwater dependent ecosystems / species are not impacted by the development (clause xviii).
recognise the unique characteristics of the site and surrounding environment by expanding on and making explicit the criteria that must be met by the proposed development, including no significant adverse impact on flooding and ecology and downstream, upstream and adjacent properties and land use, including agriculture. Consideration of potential future impacts of sea level rise / climate change on receiving environments is also included (clause xvii and clause xix).
ensure the foraging habitat of the Brolga is protected and, where appropriate, enhanced (clause xxv).
24 April 2024
At its Ordinary meeting on 24 April 2024, Council resolved to place draft amendments to Chapter 3 of the Ballina Shire Development Control Plan 2012 (BSDCP2012) on public exhibition. The proposed amendments are to Section 5.5 of Chapter 3 – Cumbalum Precinct B. The main amendments are reflected in the draft DCP plans as well as the detailed provisions and are as follows:
Relocation of the local centre to an area more centrally located to future housing
Realignment of the road network to better respond to topography
Relocation of stormwater retention basins
Nomination of areas where significant bulk earthworks may occur
Modify location and requirements for parks and community halls
New provision regarding impacts of development on groundwater
Update of provisions to reflect contemporary planning and environmental management practices.
The proposed draft amendments were exhibited from Monday 6 May 2024 to Monday 17 June 2024.
Information on public submissions and public disclosure requirements is available on our website at ballina.nsw.gov.au/your-privacy
At Council's Ordinary meeting on 22 August 2024 Council adopted the amendments with the following changes to the publicly exhibited draft DCP amendments. The amendments to the DCP will take effect from 11 September 2024:
Amended the Structure Plan and other relevant Cumbalum B Precinct plans to:
Delete the earthworks investigation areas.
Remove all stormwater and retention areas.
Delete proposed Signalised Intersection from the legend.
Remove the mapped mosquito buffer treatment areas.
Amended Element B relating to hydrology and stormwater to:
clarify the purpose of environmental monitoring measures, which is to inform subdivision design to ensure that post developmentmimics pre-development characteristics and establish the measures that will be required to ensure groundwater dependent ecosystems / species are not impacted by the development (clause xviii).
recognise the unique characteristics of the site and surrounding environment by expanding on and making explicit the criteria that must be met by the proposed development, including no significant adverse impact on flooding and ecology and downstream, upstream and adjacent properties and land use, including agriculture. Consideration of potential future impacts of sea level rise / climate change on receiving environments is also included (clause xvii and clause xix).
ensure the foraging habitat of the Brolga is protected and, where appropriate, enhanced (clause xxv).
24 April 2024
At its Ordinary meeting on 24 April 2024, Council resolved to place draft amendments to Chapter 3 of the Ballina Shire Development Control Plan 2012 (BSDCP2012) on public exhibition. The proposed amendments are to Section 5.5 of Chapter 3 – Cumbalum Precinct B. The main amendments are reflected in the draft DCP plans as well as the detailed provisions and are as follows:
Relocation of the local centre to an area more centrally located to future housing
Realignment of the road network to better respond to topography
Relocation of stormwater retention basins
Nomination of areas where significant bulk earthworks may occur
Modify location and requirements for parks and community halls
New provision regarding impacts of development on groundwater
Update of provisions to reflect contemporary planning and environmental management practices.
The proposed draft amendments were exhibited from Monday 6 May 2024 to Monday 17 June 2024.
Information on public submissions and public disclosure requirements is available on our website at ballina.nsw.gov.au/your-privacy
Please provide your feedback on this document here. The comments you provide will be a formal submission and will be considered by Council in finalising the document.
If you would like more information before making a submission, please visit ballina.nsw.gov.au/making-a-submission, and notify Council if you wish your submission to be confidential.
Consultation has concluded
Share Feedback - BSDCP 2012 - Proposed Amendments to Cumbalum Precinct B (Kinvara) on FacebookShare Feedback - BSDCP 2012 - Proposed Amendments to Cumbalum Precinct B (Kinvara) on TwitterShare Feedback - BSDCP 2012 - Proposed Amendments to Cumbalum Precinct B (Kinvara) on LinkedinEmail Feedback - BSDCP 2012 - Proposed Amendments to Cumbalum Precinct B (Kinvara) link